Each worker shall have the only key to the lock.
Lock out tag out procedure pdf.
All maintenance personnel shall be provided with a good lock.
The lock shall have the individual workers name and other identification on it.
Ensure that lockout tagout devices identify the individual users.
Lockout tagout fact sheet employees need to be trained to ensure that they know understand and follow the applicable provisions of the hazardous energy control procedure.
The authorized employee shall know the type and magnitude of energy that the machine or equipment utilizes and shall understand the hazards thereof.
Lockout tagout procedures lockout tagout 1procedures 9 health safety environment march 2013 purpose the purpose is to ensure procedures are in place to prevent injuries from the unexpected energization activation or release of hazardous energy during servicing or maintenance of machinery or equipment.
A sample lockout tagout procedure a good lockout tagout procedure at a minimum should contain the following elements.
See the note to 29 cfr 1910 147 c 4 i for an exception to the documentation requirements use only lockout tagout devices authorized for the particular equipment or machinery and ensure that they are durable standardized and substantial.
With this secured process all individuals working on the same circuit or equipment have individual locks that they secure onto a disconnect device before working on the system.
Deenergize equipment and lockout or tagout energy isolating devices.
Contract service and maintenance name of your company and contractors must be aware of their respective lockout tagout procedures before the contractor does onsite work.
Lamination should be large enough for the tag to be punched so it can be attached with the padlock.
Operate equipment controls to verify that the equipment is de energized.
Electrical lockout tagout tryout procedures 3 appendix iii lockout tagout individual card template card should be folded in half and laminated with heavy laminate.
Lock out tag out procedure page 6 3 equipment isolation from the energy source 4 application of lockout tagout devices 5 release of stored energy de energization 6 verification of isolation 7 release from lockout tagout control once work is completed including removal of lockout.
5 2 sequence of lockout or tagout system procedure notify affected employees that a lock out or tag out system is going to be utilized and the reason.